Services

Reporting & Data Support

Monitoring data that is orderly, traceable, and ready to report, from the DIS to reporting during calibration, audits, or faults.

01

When this service is needed

  • Preparing for or renewing SISPEK integration.
  • Data from the DIS is not being sent or is incomplete.
  • The environmental team struggles to build reports from raw data.
  • Management asks for a summary of monitoring performance.

02

Service scope

Permen LHK No. 13 of 2021 sets out the integration of emission monitoring into SISPEK through registration, administrative data entry, technical data entry, verification, and a connectivity test (Article 2). The integration approval is valid for three years and can be extended; re-integration is required when it expires or the CEMS is replaced (Article 7).

Data sent from the DIS to SISPEK must meet set requirements, including being sent in real time once every hour and having valid status after quality control and quality assurance (Article 9). Calibration, audits, abnormal conditions, failures, and data that is not sent are reported through SIMPEL within the defined deadlines (Article 10).

Where we help

  • Data logger and DIS configuration.
  • Checks of data completeness and validity.
  • Support through the integration stages and their renewal.
  • Preparing data for reports during calibration, audits, or faults.
  • Data summaries for internal use.

03

How we work

We see data as part of the system, not a separate matter. Data problems often start in the field: the sample line, calibration, or communication. That is why the team that maintains the system also understands its data.

Working principle: CEMS data flow to SISPEK
  1. CEMSContinuous measurement at the stack
  2. DISData Interfacing System: stores and manages CEMS data
  3. SISPEKMeasurement data sent every hour
  4. SIMPEL reportingReports during calibration, audits, or faults

Contact

Tell us about monitoring at your site.

Choose the route that fits best. Our team reviews your needs, site conditions, and timeline before preparing a recommendation.

01

Technical consultation

Discuss parameters, measurement points, and site conditions before choosing a system.

02

Request for quotation

A structured form so the quotation matches your needs and timeline.

03

Service & calibration

For installed systems that need attention.

04

Spare parts & consumables

Spare parts and consumables for running systems.